Measures to improve waste heat power generation

01 Existing problems Two clinker production lines of a company (line #1 designed clinker production capacity 700t/d, line #2 designed clinker production capacity 2500t/d) are equipped with a 7.5MW pure low-temperature waste heat power generation project. The single-pressure system is adopted. The steam turbine is low-parameter pure condensate steam turbine, with rated power of 7500kW,…